Description: Brand New 12 Foot Black Handset Curly Cord for Avaya 9600 IP, 9500 & 9400 Digital Series Phones 9608, 9610, 9620, 9620C, 9621G, 9630, 9630G, 9640, 9640G, 9650, 9650C, 9508, 9504, 9404, 9408 *Cord length is 12 feet fully stretched, and approximately 22 inches coiled. Cords & Lengths: As a telecom industry standard, the indicated lengths of handset cords are when they are fully stretched out, not when they are coiled in their packaging. Cords are rarely utilized at their full maximum stretched length, so it’s important to choose an appropriate length when buying. Available lengths for most cords are: 7 feet (11 inches coiled / unstretched) 9 feet (15 inches coiled / unstretched) 12 feet (22 inches coiled / unstretched) 25 feet (36 inches coiled / unstretched) If you have any questions at all regarding features, functionality, compatibility or condition of the equipment in this auction, please contact us.
Price: 7.99 USD
Location: Lexington, Kentucky
End Time: 2024-03-17T18:10:06.000Z
Shipping Cost: 0 USD
Product Images
Item Specifics
Restocking Fee: No
Return shipping will be paid by: Buyer
All returns accepted: Returns Accepted
Item must be returned within: 30 Days
Refund will be given as: Money Back
Brand: The VoIP Lounge
MPN: Does Not Apply